EICR Certificate Generator/ guides / MWC & remedial work

Unsatisfactory EICR: the 28-day clock and the completion certificate

An Unsatisfactory result starts two tracks at once: make dangerous things safe now (C1), and fix the rest with paperwork (C2/FI) inside 28 days. Which certificate closes each item depends on what the work was.

The priority order inside the 28 days

CodeMeaningLandlord action
C1Danger presentMake safe immediately — isolate, repair or remove. "28 days" does not apply to an exposed live part.
FIFurther investigation required without delayBook the investigation; its findings generate C-codes (or clear the item) — the clock keeps running.
C2Potentially dangerousRemedial work within 28 days, written confirmation to the tenant that it is done.
C3Improvement recommendedNo legal duty. Sensible to schedule; not part of the compliance clock.

The Regulations require further investigation or remedial work and written confirmation to the tenant that it is complete — within 28 days. Local authorities can enforce with corrective action notices and fines up to £30,000; insurers and letting agents ask for the same paperwork.

Which certificate closes which job

Remedial workCertificateWhy
Replacing a cracked/damaged accessory (socket, switch, light fitting)Minor Works CertificateAlteration/addition to an existing circuit, no new circuit
Adding RCD protection to an existing circuitMinor Works CertificateSame — alteration to an existing circuit
Repairing a consumer unit defect (replacing a broken device)Minor Works CertificateRepair, not replacement of the board
Full consumer unit replacementElectrical Installation Certificate + building-compliance certSignificant alteration; notifiable (Part P) — registered electrician notifies via their scheme
New circuit (e.g. adding a circuit to split an overloaded board)Electrical Installation Certificate + building-compliance certNew work is always EIC territory, notifiable where applicable
Whole rewires / extensions of the installationElectrical Installation CertificatePlus a fresh EICR or the EIC's own schedules to re-set the next inspection date

What an MWC must contain

The BS 7671 Minor Works Certificate records: a description of the work and the extent, the circuit details, and the test results relevant to the work — continuity of protective conductors, insulation resistance, polarity, earth-fault loop impedance (Zs) at the point of work, and RCD operation where an RCD is involved or relevant. It is signed by the person who did the work. One MWC per circuit/job (or one covering a clearly itemised batch).

Common landlord mistakes

Tracking C1/C2/FI items across a portfolio of reports, with 28-day deadlines and per-item certificates, is exactly what remedial workflows break on. The generator computes the Satisfactory/Unsatisfactory verdict from your codes and keeps the report archive per client; pair it with the due date calculator for the next inspection after remedials.
← All EICR guides · C1/C2/C3/FI codes explained · Spotting a box-ticking EICR · Due date calculator