EICR Certificate Generator/ guides / red flags

Twelve red flags of a box-ticking EICR

A genuine periodic inspection isolates every circuit and tests it. A rubber stamp photographs the consumer unit and invents the rest. Here is how to tell them apart — before you rely on the report.

On the schedule of test results

  1. Identical Zs on every circuit. Different cable runs give different readings; a schedule where all circuits share one value (usually just Ze) means the column was filled at the origin, not per circuit.
  2. No insulation resistance values. Dead testing requires every circuit to be isolated; if IR columns are blank or all show a generic ">200 MΩ", the dead tests were skipped.
  3. No RCD operating times. A 30 mA RCD must be tested at IΔn with the time recorded. "RCD: Yes/No" without times is an incomplete test.
  4. No schedule at all. The BS 7671 EICR pack includes the Schedule of Test Results / Circuit Details. "Report only" means the test evidence doesn't exist.
  5. Instrument details missing. The form asks for test instrument serial/asset numbers — calibrated instruments are traceable; nothing to write means nothing was used.

In the report body

  1. "Satisfactory" with C2s listed. Any C1, C2 or FI makes the overall assessment UNSATISFACTORY — by definition. This error alone should end your trust in the report.
  2. Observations without locations. "Damaged socket — C2" without a room means nobody wrote it down on site.
  3. Copy-paste text across properties. If you manage several lets and the observations are word-for-word identical, you're reading a template, not a survey.
  4. No extent/limitations statement. Section D must state what was covered and what wasn't (and agree it with the person ordering). Blank or boilerplate limitations hide unfloored lofts and inaccessible boards.
  5. No next-inspection date. Section F left as "valid until change of tenancy" or blank — see why that wording is wrong.

On the day

  1. Impossibly short visit. A 2–3 bed house takes ~2–4 hours: dead tests alone mean isolating each circuit, then live tests, RCD times, inspection of accessories, loft, and earth arrangements. Ask what the quote's visit duration covers — a half-day booking that ends in 45 minutes produced nothing defensible. r/ukelectricians is full of landlords describing exactly this.
  2. Power left off "temporarily". If dead testing happened, your power was off for a chunk of the visit. A full set of results with zero downtime means the results weren't taken from your installation.

What a proper report looks like

If you already hold a suspect report, a second opinion is cheaper than a fire — ask a registered electrician to review the schedules for plausibility (values in range, per-circuit variation). And if you issue reports: the generator produces the full pack — schedules with per-circuit rows, instrument fields, automatic Satisfactory/Unsatisfactory from your codes — so nothing gets filled in at the desk.
← All EICR guides · C1/C2/C3/FI codes explained · "Valid until change of tenancy" myth · Generate an EICR PDF