EICR Certificate Generator/ guides / Scotland & Wales

EICR rules across the UK nations

Same certificate, four different statutes. The report format is BS 7671 everywhere — what changes is who the law binds, since when, and what extras ride on top.

NationRequirementIn forceGoverning law
EnglandEICR every 5 years (max)1 Jul 2020 (new tenancies); 1 Apr 2021 (all)Electrical Safety Standards in the PRS (England) Regulations 2020
WalesEICR every 5 years (max)1 Dec 2022 (all tenancies)Renting Homes (Wales) Act 2016 framework
ScotlandElectrical safety inspection: periodic inspection & test + PAT, before first let and every 5 yearsDec 2015Housing (Scotland) Act 2006 — Repairing Standard
Northern IrelandNo dedicated landlord EICR statute (HMO and fitness duties apply)—Housing (NI) Order; fitness standards

England — the 2020 template

New tenancies from 1 July 2020, all existing tenancies by 1 April 2021: inspection every 5 years max, copy to tenants within 28 days, new tenants before occupation, authority within 7 days on request, penalties up to £30,000, remedial work confirmed in writing within 28 days of an Unsatisfactory result. England has since extended the regime to the social rented sector (in force for social landlords from 1 November 2025, applying per the regulations' transitional dates) — so housing associations now sit under the same duty.

Wales — 1 December 2022

Wales implemented the same duty through the Renting Homes (Wales) Act 2016: occupation contracts must have a valid electrical condition report every 5 years, with the home treated as unfit for human habitation if the duty is breached. The practical mechanics — competent person, copy deadlines, remedial confirmation — mirror England. Note Welsh tenancies are now "occupation contracts" with "contract-holders", not tenancies with tenants; the electrical duty is unchanged.

Scotland — first and strictest on appliances

Under the Repairing Standard (statutory guidance, Annex D), a landlord must have an electrical safety inspection — periodic inspection and testing of the installation PLUS in-service inspection and testing of electrical equipment (PAT) — carried out by a skilled person before the property is let for the first time and at intervals of no more than 5 years. Points worth knowing:

What stays the same everywhere

Portfolio across borders? A single archive keyed by statutory regime prevents the classic failure — booking an English-style inspection for a Scottish property and forgetting the PAT. The generator and due date calculator work nation-agnostic: set the tenancy type, get the deadline.
← All EICR guides · How often is an EICR required? · HMO requirements · Generate an EICR PDF